If you run projects in Orange County, you know the bid window rarely gives anyone extra time. The fireproofing number often comes in late, or comes in with so many exclusions and assumptions that you can’t level it against the others. Most of the time the cause is simple: the fireproofing sub didn’t get the documents they needed to price the job. Here is what to send so you get a fast fireproofing bid that’s actually usable.
Why does a fireproofing bid need more than the structural sheets?
Structural drawings show the steel. They don’t tell a fireproofer how thick the material has to be, which product is allowed, or what each member needs. Those answers live in a few different places in the set, and a bid built from the structural sheets alone has to guess.
The thickness on every beam, column and deck is set by the fire-resistance rating and the UL design called out on the drawings. Without the design numbers, a sub either assumes something and lists it as an exclusion, or holds the bid until someone answers an RFI. Neither helps you on bid day.
What documents should a GC send for a fireproofing bid?
Send these and you remove most of the guesswork:
- Architectural code sheets and life safety plans. These show the construction type and the required ratings for columns, beams, floors and roof.
- Every sheet with UL design numbers. Usually wall and floor assembly sheets, rated details, or a fireproofing schedule. If the designs are only in the spec, say so.
- The fireproofing spec section. It sets the allowed products, density requirements, testing and inspection, and anything unusual like exterior or high-humidity areas.
- Full structural set. Framing plans, column schedules and the steel sizes so members can be counted and measured.
- Paint and primer spec for structural steel. Whether steel arrives bare, shop-primed or galvanized changes the price (more on that below).
- Addenda and the bid form. So everyone prices the same scope.
A link to a plan room or a shared folder is fine. Partial sets are where numbers go sideways.
What scope questions should be answered up front?
A few scope lines cause most of the back-and-forth on fireproofing bids. Settle them in the invite and every number you get back will be comparable:
- Patch and repair. Who patches fireproofing damaged by MEP trades after the initial spray? Is it in the base bid, a unit price, or time and material?
- Exposed steel. Is any structural steel left exposed in lobbies, canopies or open ceilings? That usually means intumescent coating instead of spray fireproofing, and it is priced very differently.
- Exterior or high-humidity areas. Standard interior spray fireproofing is not made for weather exposure. Parking structures, canopies and coastal exposure need to be identified.
- Masking and protection. Who protects glazing, finished surfaces and adjacent work from overspray?
- Access. Will the sub use the GC’s lifts, or bring their own?
- Inspection. Who hires the special inspector, and who pays for re-inspection if something fails?
Why does primer on structural steel matter to the price?
Spray fireproofing has to bond to the steel. Bare, clean steel is the simplest case. Some shop primers are compatible with a given fireproofing product, and some aren’t. When the primer isn’t listed as compatible, the fix is usually bond testing, a bonding agent, or mechanical attachment like metal lath, and each of those adds cost and time.
If the steel spec calls for primer, send it with the bid package. A fireproofer who knows the primer can price the right answer instead of carrying an exclusion. If the steel spec is still open, it is worth asking whether the steel that gets fireproofed can be left unprimed, which is common on interior steel.
How much schedule detail does a fireproofing sub need?
You don’t need a full baseline schedule, but a few dates make a real difference:
- When the steel and deck will be up and ready for fireproofing in each area.
- Whether the work runs in phases or one continuous push.
- When MEP rough-in starts, since hangers and supports installed before spray day mean less patching later.
- Any weather or temperature limits on the site, since spray fireproofing has cure requirements.
Fireproofing usually sits between steel and MEP, so the sooner your fireproofer understands the sequence, the less chance it holds up the trades behind it.
What makes a fireproofing bid easy to level?
When you send the same complete package to every bidder, the numbers come back on the same scope. Ask each bidder to:
- List the UL designs and products they priced.
- Break out patch and repair, intumescent and any exterior work as separate lines.
- Call out every exclusion and assumption in plain language.
A bid that shows its basis is easier to defend to the owner and easier to buy out once the job is awarded. If a bidder can’t tell you which UL design they priced, that’s a question to ask before you carry their number.
Get a fireproofing number on your Orange County project
A1 Fireproofing and Specialty Coatings is a fireproofing and specialty coatings subcontractor based in Huntington Beach. We price spray-applied fireproofing, intumescent coatings and fireproofing patch and repair for general contractors, project managers and building owners, plus protective coatings and commercial painting.
Send your drawings and specs to info@a1fireproofingandspecialtycoatings.com or call (562) 475-2757, Monday through Friday, 6 AM to 5 PM. You can also reach us through our contact page. We serve Los Angeles, Orange County, the Inland Empire and San Diego.